Maintenance Safety Operating Procedures
**Safety Operating Procedures for Maintenance of Surrounding Double Platform Cutting Machine**
1、 Shutdown inspection
Before carrying out maintenance on the surround type dual platform cutting machine, it is necessary to ensure that the cutting machine has completely stopped. Ensure that all moving parts of the machine have come to a complete stop to avoid accidents during maintenance.
2、 Power supply disconnected
Before carrying out any maintenance work, the power supply of the cutting machine must be disconnected. This can be achieved by turning off the power switch or unplugging the power plug. After ensuring that the power supply has been disconnected, a voltmeter can be used to check and confirm.
3、 Tool preparation
Prepare the necessary tools for maintenance, including screwdrivers, wrenches, pliers, multimeters, etc. Ensure that these tools are in good condition and suitable for repair work.
4、 Fixed platform
During disassembly or maintenance, it is necessary to fix the platform of the cutting machine to prevent it from moving or sliding during the maintenance process. Fixed tools such as fixtures or ropes can be used to achieve this.
5、 Protective equipment
Maintenance personnel must wear appropriate protective equipment during maintenance, such as safety helmets, protective goggles, gloves, work clothes, etc. These equipment can effectively protect maintenance personnel from injury.
6、 Remove debris
Before starting maintenance, it is necessary to clean up debris and dust in the work area to ensure a clean working environment. Sundries and dust may interfere with maintenance work and even cause accidents.
7、 Dismantling in sequence
When disassembling the cutting machine, it is necessary to follow the prescribed sequence. Do not disassemble at will to avoid component damage or personal injury. Follow the instructions in the manual or maintenance manual for disassembly.
8、 Carefully inspect
During the maintenance process, it is necessary to carefully inspect each component of the cutting machine to identify the cause of the malfunction. Use tools such as a multimeter to test circuits and electrical components, ensuring the accuracy of maintenance work.
9、 Maintenance records
After the repair is completed, it is necessary to keep a maintenance record, detailing the problems encountered during the repair process and their solutions. These records can serve as future references and also help track the use and maintenance of the cutting machine.
10、 Acceptance testing
After the repair is completed, acceptance testing must be carried out to ensure the normal performance of the cutting machine and that there are no outstanding issues with the repair work. During the testing process, special attention should be paid to the repaired parts to ensure their proper functioning.
The above is the complete content of the safety operation regulations for the maintenance of the surround type dual platform cutting machine. When carrying out maintenance work, maintenance personnel must strictly follow these regulations to ensure their own safety and the normal operation of the cutting machine
Manhart (Guangdong) CNC Machine Tool Co., Ltd. Surrounding Double Platform Cutting Machine
17
Th4